March 31, 2010
Cobb County, Georgia
Carter Concrete Structures has been awarded construction of five diversion structures by Shea-Traylor on the on Cobb County’s South Cobb Tunnel Project. Carter will perform excavation, excavation retention and concrete work in five locations along the path of the tunnel, a 27 foot diameter bore that extends 29,000 feet at an elevation of 450 feet below grade. This is Carter’s second outing building these types of structures for tunnels in the Atlanta area. Follow these links to learn more about this project and Shea–Traylor.